Rizqyesta, Winona and Ningrum, Wahyu Mawar (2022) Pelaksanaan Pekerjaan Perkuatan Tanggul Pada Proyek Pengendalian Banjir Sungai Bringin Kota Semarang (lokasi : LM2022TKBA07-34). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN -Winona Rizqyesta-191007- Wahyu Mawar Ningrum-191034-Laporan Magang-2022.pdf.pdf
Download (515kB)
COVER -Winona Rizqyesta-191007- Wahyu Mawar Ningrum-191034-Laporan Magang-2022.pdf.pdf
Download (39kB)
FULLREPORT -Winona Rizqyesta-191007- Wahyu Mawar Ningrum-191034-Laporan Magang-2022.pdf.pdf
Restricted to Repository staff only
Download (18MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Riyanto, Didit Puji 5202108401 diditr.pu@gmail.com UNSPECIFIED Suhardi, Suhardi 5207107501 hardisuh@gmail.com |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Winona Rizqyesta |
| Date Deposited: | 24 Aug 2022 04:14 |
| Last Modified: | 24 Aug 2022 04:14 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/98 |
