ICB Package LOS-04 On-Farm System and Tertiary Canals Upgrading Works Left Bank IV For Rentang Irrigation Modernization Project (RIMP) Kabupaten Indramayu, Provinsi Jawa Barat

Kirana, Syasa and Az-Zahra, Valentina (2025) ICB Package LOS-04 On-Farm System and Tertiary Canals Upgrading Works Left Bank IV For Rentang Irrigation Modernization Project (RIMP) Kabupaten Indramayu, Provinsi Jawa Barat. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of PERSETUJUAN] Text (PERSETUJUAN)
PERSETUJUAN-Syasa-221070-Valentina-221072-Laporan Magang-2025.pdf

Download (6MB)
[thumbnail of COVER] Text (COVER)
COVER-Syasa-221070-Valentina-221072-Laporan Magang 2025.pdf

Download (192kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Syasa-221070-Valentina-221072-Laporan Magang-2025.pdf
Restricted to Repository staff only

Download (7MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Arisanto, Pranu
5205068301
pranu.arisanto@pu.go.id
Additional Information: 2025 TKBA 70-72
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3
Depositing User: Syasa Dwi Kirana
Date Deposited: 20 Aug 2025 08:41
Last Modified: 20 Aug 2025 08:41
URI: http://eprints.politeknikpu.ac.id/id/eprint/908

Actions (login required)

View Item
View Item