Darwin, Achmad and Irfansyah, Chabib Faizal (2025) Komering Irrigation Project (KIP) Phase 3 Package 2 Belitang Secondary Canal(BB.0-BB.15), Lempuing Secondary and Sub-Secondary Canal and Tertiary Development(Block I and J), South Sumatera Province. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN - Achmad Darwin - 221001 - Chabib Faizal Irfansyah - 221017- Laporan Magang -2025.pdf
Download (497kB)
COVER - Achmad Darwin - 221001 - Chabib Faizal Irfansyah - 221017- Laporan Magang -2025..pdf
Download (166kB)
FULL REPORT - Achmad Darwin - 221001 - Chabib Faizal Irfansyah - 221017- Laporan Magang -2025..pdf
Restricted to Repository staff only
Download (23MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Sasangka, Daru Jaka 5218088801 darujakasasangka@pu.go.id |
| Additional Information: | 2025 TKBA 01-17 |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Achmad Darwin |
| Date Deposited: | 20 Aug 2025 04:56 |
| Last Modified: | 20 Aug 2025 04:56 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/873 |
