ICB PACKAGE LOS-02: ON-FARM SYSTEM AND TERTIARY CANALS UPGRADING WORKS LEFT BANK II FOR RENTANG IRRIGATION MODERNIZATION PROJECT (RIMP) KABUPATEN INDRAMAYU, JAWA BARAT

Simamora, Asima Ayu Pratiwi and Nababan, Desli Nurmei (2025) ICB PACKAGE LOS-02: ON-FARM SYSTEM AND TERTIARY CANALS UPGRADING WORKS LEFT BANK II FOR RENTANG IRRIGATION MODERNIZATION PROJECT (RIMP) KABUPATEN INDRAMAYU, JAWA BARAT. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of PERSETUJUAN] Text (PERSETUJUAN)
PERSETUJUAN-Asima-221010-Desli-221020-Laporan Magang-2025.pdf

Download (311kB)
[thumbnail of COVER] Text (COVER)
COVER-Asima-221010-Desli-221020-Laporan Magang-2025.pdf

Download (64kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Asima-221010-Desli-221020-Laporan Magang-2025.pdf
Restricted to Repository staff only

Download (24MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Hetwisari, Tia
5226038401
tia.hetwisari@pu.go.id
Additional Information: 2025 TKBA 10-20
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3
Depositing User: Desli Nurmei Nababan
Date Deposited: 19 Aug 2025 09:20
Last Modified: 19 Aug 2025 09:20
URI: http://eprints.politeknikpu.ac.id/id/eprint/844

Actions (login required)

View Item
View Item