Syachrani, Dina and Setiyani, Setiyani (2025) Rentang Irrigation Modernization Project (RIMP) ICB Package Loan Secondary System LSS-01 Secondary Canals And Drains Upgrading Work Left Bank I For Rentang Irrigation Modernization Project Kabupaten Indramayu Provinsi Jawa Barat. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN-Dina Syachrani-221022-Setiyani-221067-Laporan Magang-2025..pdf
Download (162kB)
COVER-Dina Syachrani-221022-Setiyani-221067-Laporan magang-2025.pdf
Download (140kB)
FULLREPORT-Dina Syachrani-221022-Setiyani-221067-Laporan Magang-2025..pdf
Restricted to Repository staff only
Download (20MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Hetwisari, Tia 5226038401 UNSPECIFIED |
| Additional Information: | 2025 TKBA 22-67 |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Setiyani Setiyani |
| Date Deposited: | 20 Aug 2025 08:07 |
| Last Modified: | 20 Aug 2025 08:07 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/827 |
