Istifa, Nayla Nashwa and Pramana, Rinjani Angelica Laras (2025) PEMBANGUNAN BENDUNGAN KARANGNONGKO PAKET II KABUPATEN BOJONEGORO, PROVINSI JAWA TIMUR DAN KABUPATEN BLORA, PROVINSI JAWA TENGAH. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN-Nayla Nashwa Istifa-221049-Rinjani Angelica Laras Pramana-221062-Laporan Magang-2025.pdf
Download (463kB)
COVER-Nayla Nashwa Istifa-221049-Rinjani Angelica Laras Pramana-221062-Laporan Magang-2025.pdf
Download (98kB)
FULL REPORT-Nayla Nashwa Istifa-221049-Rinjani Angelica Laras Pramana-221062-Laporan Magang-2025.pdf
Restricted to Repository staff only
Download (4MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Sasangka, Daru Jaka 198808182014021001 darujakasasangka@pu.go.id |
| Additional Information: | 2025 TKBA 49-62 |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Nayla Nashwa Istifa |
| Date Deposited: | 18 Aug 2025 10:39 |
| Last Modified: | 18 Aug 2025 10:39 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/765 |
