ICB Package LOS-04 ON-Farm System Ant Tertiary Canals Upgrading Works Left Bank IV For Rentang Irrigation Modernization Project (RIMP)(lokasi: TA2024TKBA01-08)

Rahma, Auliya and Rosyada, Ade (2024) ICB Package LOS-04 ON-Farm System Ant Tertiary Canals Upgrading Works Left Bank IV For Rentang Irrigation Modernization Project (RIMP)(lokasi: TA2024TKBA01-08). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of PERSETUJUANPUBLIKASI] Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN PUBLIKASI-Ade-211001-Auliya-211008-Laporan Magang-2024.pdf

Download (252kB)
[thumbnail of COVER] Text (COVER)
COVER-Ade-211001-Auliya-211008-Laporan Magang-2024.pdf

Download (153kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Ade-211001-Auliya-211008-Laporan Magang-2024.pdf
Restricted to Repository staff only

Download (48MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Puji, Didit
198410022010121001
UNSPECIFIED
UNSPECIFIED
Arisanto, Pranu
198305062010121004
UNSPECIFIED
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3
Depositing User: Auliya Rahma Diva
Date Deposited: 30 Aug 2024 01:07
Last Modified: 30 Aug 2024 01:07
URI: http://eprints.politeknikpu.ac.id/id/eprint/605

Actions (login required)

View Item
View Item