Adianto, Ryan and Shamaradewi, Salsabilla (2024) Proyek Pelaksanaan Pembangunan Jalan Tol Akses Patimban Paket 4 STA 33+500 – 37+050 (lokasi: LM2024TKJJ40-41). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN -Ryan Sava Adianto-212040- Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Download (56kB)
PERSETUJUAN -Ryan Sava Adianto-212040- Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Download (56kB)
Text (COVER)
COVER-Ryan Sava Adianto-212040-Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Download (144kB)
COVER-Ryan Sava Adianto-212040-Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Download (144kB)
Text (FULLREPORT)
FULL REPORT-Ryan Sava Adianto-212040-Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Restricted to Repository staff only
Download (7MB) | Request a copy
FULL REPORT-Ryan Sava Adianto-212040-Salsabilla Lakshmidina Shamaradewi-212041-Laporan Magang-2024.pdf
Restricted to Repository staff only
Download (7MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Hamdani, Dani 5217028001 UNSPECIFIED UNSPECIFIED Dhanardono, Bhima 5208028201 UNSPECIFIED |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
Depositing User: | RyanSavaAd |
Date Deposited: | 29 Aug 2024 05:59 |
Last Modified: | 29 Aug 2024 05:59 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/548 |