Proyek ICB Package LSS-07 Secondary Canals And Drains Upgrading Works Left Bank VII For Rentang Irrigation Modernization Project (RIMP) (lokasi : LM2024TKBA09-48)

Muzahidin, Bahrul and Aryanto, Darul Dwi (2024) Proyek ICB Package LSS-07 Secondary Canals And Drains Upgrading Works Left Bank VII For Rentang Irrigation Modernization Project (RIMP) (lokasi : LM2024TKBA09-48). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of PERSETUJUANPUBLIKASI] Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN-Bahrul Muzahidin-211009-Darul Dwi Aryanto-211048-Laporan Magang-2024.pdf

Download (614kB)
[thumbnail of COVER] Text (COVER)
COVER-Bahrul Muzahidin-211009-Darul Dwi Aryanto-211048-Laporan Magang-2024.pdf

Download (184kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Bahrul Muzahidin-211009-Darul Dwi Aryanto-211048-Laporan Magang-2024.pdf
Restricted to Repository staff only

Download (227MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Prasetyo, Wahyu
5226058401
wahyu.prasetyo@pu.go.id
UNSPECIFIED
Sasangka, Daru Jaka
5218088801
darujakasasangka@pu.go.id
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3
Depositing User: Bahrul Muzahidin
Date Deposited: 28 Aug 2024 13:01
Last Modified: 28 Aug 2024 13:01
URI: http://eprints.politeknikpu.ac.id/id/eprint/501

Actions (login required)

View Item
View Item