Pahlevi, Muhammad Reza and Ramadhan, Robby Berlian Adi (2024) Pelaksanaan dan Pengawasan Pekerjaan Bangunan Bawah Jembatan (Studi Kasus Pembangunan Jembatan sta 21+509-21+869 Proyek Tol Binjai Brandan Zona 2) (lokasi : LM2023TKJJ23-27). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
Text (PERSETUJUAN)
PERSETUJUAN - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (3).pdf
Download (228kB)
PERSETUJUAN - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (3).pdf
Download (228kB)
Text (COVER)
COVER - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (2).pdf
Download (103kB)
COVER - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (2).pdf
Download (103kB)
Text (FULLREPORT)
FULL REPORT - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (1).pdf
Restricted to Repository staff only
Download (16MB) | Request a copy
FULL REPORT - Muhammad Reza Pahlevi - 202023 - Robby Berlian Adi Ramadhan - 202027 - Tugas Akhir - 2023 (1).pdf
Restricted to Repository staff only
Download (16MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Dhanardono, Bhima UNSPECIFIED UNSPECIFIED |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
Depositing User: | Ainun Hapsari |
Date Deposited: | 05 Feb 2024 07:51 |
Last Modified: | 05 Feb 2024 07:51 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/435 |