Khamidah, Esti Nur and Navashagandhi, Nurul Jasmine Pelaksanaan Pembangunan Jalan Tol Ruas Pekanbaru-Padang Seksi Padang-Sicincin Sta 6+050-30+400 (lokasi : LM2023TKJJ30-41). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN-Esti-202030-Nurul-202041-Laporan Magang-2023.pdf
Download (686kB)
COVER-Esti-202030-Nurul-202041-Laporan Magang-2023.pdf
Download (53kB)
FULL REPORT-Esti-202030-Nurul-202041-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (161MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Hamdani, Dani UNSPECIFIED UNSPECIFIED |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
| Depositing User: | Ainun Hapsari |
| Date Deposited: | 30 Jan 2024 07:26 |
| Last Modified: | 30 Jan 2024 07:26 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/405 |
