Kinanti, Aisha Hibatullah and Apriyanto, Muhammad Faisal Proyek Duplikasi Jembatan Callender Hamilton Tajum Karangbawang (lokasi : LM2023TKJJ04-45). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN PUBLIKASI-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (210kB)
PERSETUJUAN PUBLIKASI-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (210kB)
Text (COVER)
COVER-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (670kB)
COVER-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (670kB)
Text (FULLREPORT)
FULL REPORT-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (56MB) | Request a copy
FULL REPORT-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (56MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Utama, Adityo Budi UNSPECIFIED UNSPECIFIED |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
Depositing User: | Ainun Hapsari |
Date Deposited: | 30 Jan 2024 03:03 |
Last Modified: | 30 Jan 2024 03:03 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/400 |