Kinanti, Aisha Hibatullah and Apriyanto, Muhammad Faisal Proyek Duplikasi Jembatan Callender Hamilton Tajum Karangbawang (lokasi : LM2023TKJJ04-45). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN PUBLIKASI-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (210kB)
COVER-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Download (670kB)
FULL REPORT-Aisha-202004-M Faisal-202045-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (56MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Utama, Adityo Budi UNSPECIFIED UNSPECIFIED |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
| Depositing User: | Ainun Hapsari |
| Date Deposited: | 30 Jan 2024 03:03 |
| Last Modified: | 30 Jan 2024 03:03 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/400 |
