Putra, Stefanus Oscario and Nugroho, Aditya Hafidhian Proyek Pembangunan Rumah Sakit Haji Medan Gedung Rawat Inap Tower 1 (lokasi : LM2023TKBG03-04). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN-Stefanus-203003-Aditya-203004-Tugas Akhir-2023.pdf
Download (350kB)
PERSETUJUAN-Stefanus-203003-Aditya-203004-Tugas Akhir-2023.pdf
Download (350kB)
Text (COVER)
COVER-Stefanus-203003-Aditya-203004-Laporan Magang-2023.pdf
Download (136kB)
COVER-Stefanus-203003-Aditya-203004-Laporan Magang-2023.pdf
Download (136kB)
Text (FULLREPORT)
FULL REPORT-Stefanus -203003-Aditya203004-Laporan Magang-2023-compressed.pdf
Restricted to Repository staff only
Download (46MB) | Request a copy
FULL REPORT-Stefanus -203003-Aditya203004-Laporan Magang-2023-compressed.pdf
Restricted to Repository staff only
Download (46MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Utama, Agung Bhakti UNSPECIFIED UNSPECIFIED UNSPECIFIED Wulandari, Mariana UNSPECIFIED UNSPECIFIED |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Bangunan Gedung > Teknologi Konstruksi bangunan Gedung D3 |
Depositing User: | Ainun Hapsari |
Date Deposited: | 22 Dec 2023 03:35 |
Last Modified: | 22 Dec 2023 03:35 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/377 |