Studi Evaluasi Manajemen Konstruksi Pekerjaan Galian Batu Dengan Peledakan Pada Bangunan Pelimpah Proyek Pembangunan Bendungan Budong - Budong (lokasi : TA2023TKBA32-53)

Naufal, M. Aflahan and Simamora, Waldemar Victoryno (2023) Studi Evaluasi Manajemen Konstruksi Pekerjaan Galian Batu Dengan Peledakan Pada Bangunan Pelimpah Proyek Pembangunan Bendungan Budong - Budong (lokasi : TA2023TKBA32-53). Diploma thesis, Politeknik Pekerjaan Umum.

[thumbnail of PERSETUJUAN] Text (PERSETUJUAN)
PERSETUJUAN-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (376kB)
[thumbnail of COVER] Text (COVER)
COVER-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (3MB)
[thumbnail of LEGALITAS] Text (LEGALITAS)
LEGALITAS-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (5MB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (4MB)
[thumbnail of BABI] Text (BABI)
BAB I-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (3MB)
[thumbnail of BABII] Text (BABII)
BAB II-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[thumbnail of BABIII] Text (BABIII)
BAB III-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[thumbnail of BABIV] Text (BABIV)
BAB IV-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[thumbnail of BABV] Text (BABV)
BAB V-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (3MB)
[thumbnail of DAFTARPUSTAKA] Text (DAFTARPUSTAKA)
DAFTAR PUSTAKA-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf

Download (3MB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN-Aflahan-201032-Waldemar-201053-Tugas Akhir-2023.pdf
Restricted to Repository staff only

Download (14MB) | Request a copy

Abstract

One of the main objectives of infrastructure development in Indonesia by the Ministry of Public Works and People's Housing is to ensure food and water security through the construction of dams. Currently, one of the dams under construction is the Budong-Budong Dam. In dam construction, complementary structures are necessary to support the dam's foundation. The construction of spillway structures
involves excavation work, which is categorized into three types: mechanical soil excavation, mechanical rock excavation using an Excavator Hydraulic Breaker,
and hard rock excavation using blasting. The blasting method is used for hard rock excavation and is performed through open blasting with limited timing or during
non-operational periods. This research aims to determine the implementation method and cost estimation required for the hard rock excavation with blasting for
the spillway structure of the Budong-Budong Dam. The research method employed in this study is a field study through observation and data collection. Based on the
conducted research, the implementation method for hard rock excavation with blasting in the Spillway Structure of the Budong-Budong Dam project includes preparation, drilling, charging, checklist, checking the blasting location, blasting, loading, and hauling the blasted material. After five observations, it was found that the cost estimation for the blasting work in this project is already efficient at
24.55%, with a net revenue of Rp231,120,492.41.

Item Type: Thesis (Diploma)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Herwindo, Wildan
UNSPECIFIED
UNSPECIFIED
UNSPECIFIED
Riyanto, Didit Puji
UNSPECIFIED
UNSPECIFIED
Uncontrolled Keywords: Spillway Building, Blasting, Construction Management
Subjects: L Education > L Education (General)
Depositing User: Ainun Hapsari
Date Deposited: 24 Aug 2023 09:20
Last Modified: 24 Aug 2023 09:20
URI: http://eprints.politeknikpu.ac.id/id/eprint/317

Actions (login required)

View Item
View Item