Maharani, Beti and Kurniawati, Hani Proyek ICB Package Lss-06 Secondary Canal And Drains Upgrading Work Left Bank VI For Rentang Irrigation Modernization Project, West Java (lokasi : LM2023TKBA17-33). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
![[thumbnail of PERSETUJUANPUBLIKASI]](http://eprints.politeknikpu.ac.id/style/images/fileicons/text.png)
PERSETUJUAN PUBLIKASI - Beti - 201017 - Hani - 201033 - Laporan Magang - 2023.pdf
Download (780kB)
![[thumbnail of COVER]](http://eprints.politeknikpu.ac.id/style/images/fileicons/text.png)
COVER - Beti - 201017 - Hani - 201033 - Laporan Magang - 2023.pdf
Download (40MB)
![[thumbnail of FULLREPORT]](http://eprints.politeknikpu.ac.id/style/images/fileicons/text.png)
FULL REPORT - Beti - 201017 - Hani - 201033 - Laporan Magang - 2023.pdf
Restricted to Repository staff only
Download (40MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Bahri, Syamsul UNSPECIFIED UNSPECIFIED UNSPECIFIED Arisanto, Pranu UNSPECIFIED UNSPECIFIED |
Uncontrolled Keywords: | Saluran Pengelak, Steel Sheet Pile, PVC Pipe, Daerah Irigasi Rentang-Indramayu |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
Depositing User: | Ainun Hapsari |
Date Deposited: | 23 Aug 2023 04:31 |
Last Modified: | 23 Aug 2023 04:31 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/309 |