Vania, Salsabila Rizqi and Bahrodin, Lykaila Inti (2023) Proyek Pengendalian Banjir Kali Bekasi Paket 1 (lokasi : LM2023TKBA04-23). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
COVER-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf
Download (138kB)
PERSETUJUAN PUBLIKASI-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf
Download (392kB)
FULL REPORT-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (50MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Suhardi, Suhardi UNSPECIFIED UNSPECIFIED UNSPECIFIED Patiroi, Andi UNSPECIFIED UNSPECIFIED |
| Uncontrolled Keywords: | pondasi bore pile, metode pelaksanaan, produktivitas. |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Ainun Hapsari |
| Date Deposited: | 23 Aug 2023 04:29 |
| Last Modified: | 23 Aug 2023 04:29 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/306 |
