Proyek Pengendalian Banjir Kali Bekasi Paket 1 (lokasi : LM2023TKBA04-23)

Vania, Salsabila Rizqi and Bahrodin, Lykaila Inti (2023) Proyek Pengendalian Banjir Kali Bekasi Paket 1 (lokasi : LM2023TKBA04-23). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of COVER] Text (COVER)
COVER-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf

Download (138kB)
[thumbnail of PERSETUJUANPUBLIKASI] Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN PUBLIKASI-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf

Download (392kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Salsabila Rizqi Vania-201004-Lykaila Inti Bahrodin-201023-Laporan Magang-2023.pdf
Restricted to Repository staff only

Download (50MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Suhardi, Suhardi
UNSPECIFIED
UNSPECIFIED
UNSPECIFIED
Patiroi, Andi
UNSPECIFIED
UNSPECIFIED
Uncontrolled Keywords: pondasi bore pile, metode pelaksanaan, produktivitas.
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3
Depositing User: Ainun Hapsari
Date Deposited: 23 Aug 2023 04:29
Last Modified: 23 Aug 2023 04:29
URI: http://eprints.politeknikpu.ac.id/id/eprint/306

Actions (login required)

View Item
View Item