Yulis Dwi Aryani, Sysca and Wulan Ismaningrum, Miranda (2023) Proyek Pengendalian Banjir Dan Rob Sungai Loji-Banger Paket III (lokasi : LM2023TKBA41-48). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
COVER-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (55kB)
PERSETUJUAN-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (452kB)
FULL REPORT-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (102MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Suhardi, Suhardi UNSPECIFIED UNSPECIFIED UNSPECIFIED Sasangka, Daru Jaka UNSPECIFIED UNSPECIFIED |
| Uncontrolled Keywords: | Produktivitas, Pemancangan, Diesel Hammer, Electric Vibratory Hammer, CCSP |
| Subjects: | L Education > L Education (General) |
| Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
| Depositing User: | Ainun Hapsari |
| Date Deposited: | 23 Aug 2023 04:28 |
| Last Modified: | 23 Aug 2023 04:28 |
| URI: | http://eprints.politeknikpu.ac.id/id/eprint/305 |
