Yulis Dwi Aryani, Sysca and Wulan Ismaningrum, Miranda (2023) Proyek Pengendalian Banjir Dan Rob Sungai Loji-Banger Paket III (lokasi : LM2023TKBA41-48). Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
Text (COVER)
COVER-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (55kB)
COVER-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (55kB)
Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (452kB)
PERSETUJUAN-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Download (452kB)
Text (FULLREPORT)
FULL REPORT-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (102MB) | Request a copy
FULL REPORT-Sysca Yulis Dwi Aryani-201041-Miranda Wulan Ismaningrum-201048-Laporan Magang-2023.pdf
Restricted to Repository staff only
Download (102MB) | Request a copy
Item Type: | Monograph (Technical Report) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Suhardi, Suhardi UNSPECIFIED UNSPECIFIED UNSPECIFIED Sasangka, Daru Jaka UNSPECIFIED UNSPECIFIED |
Uncontrolled Keywords: | Produktivitas, Pemancangan, Diesel Hammer, Electric Vibratory Hammer, CCSP |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Bangunan Air > Teknologi Konstruksi Bangunan Air D3 |
Depositing User: | Ainun Hapsari |
Date Deposited: | 23 Aug 2023 04:28 |
Last Modified: | 23 Aug 2023 04:28 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/305 |