Avenka, Restu and Rahayu, Nadila (2022) Cycle Time Loading Analysis Of Concrete Pile Products Analisa Waktu Pemuatan Produk Tiang Pancang Pada PT. Wijaya Karya Beton Di Boyolali (lokasi : TA2022TKJJ29-50). Diploma thesis, Politeknik Pekerjaan Umum.
PERSETUJUAN-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (217kB)
COVER-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (156kB)
LEGALITAS-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (1MB)
ABSTRAK-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (196kB)
BAB I-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (856kB)
BAB II-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Restricted to Repository staff only
Download (2MB) | Request a copy
BAB III-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Restricted to Repository staff only
Download (687kB) | Request a copy
BAB IV-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Restricted to Repository staff only
Download (1MB) | Request a copy
BAB V-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (1MB)
DAFTAR PUSTAKA-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Download (93kB)
LAMPIRAN-Restu-192029-Nadila-192050-Tugas Akhir-2022.pdf
Restricted to Repository staff only
Download (4MB) | Request a copy
Abstract
The distribution process at PT Wijaya Karya Beton Boyolali which is carried out almost every day is directly proportional to the production process that is running every day. Distribution is done by transporting the product by each project in need. At one time, the distribution process can take a long time due to many factors. one of them is the finishing process which is often carried out when it will be distributed and the product stockyard area is not able to accommodate the number of products produced every day. PT Wijaya Karya Beton Boyolali also tries to send some of the products that have not been distributed by storing the products in additional storage areas. In order to shorten the distribution time, the researcher tries to analyze the problem at PT Wijaya Karya Beton Boyolali.
Item Type: | Thesis (Diploma) |
---|---|
Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Masrianto, Masrianto 8887123419 UNSPECIFIED |
Uncontrolled Keywords: | Time, Distribution, Finishing, Stockyard |
Subjects: | L Education > L Education (General) |
Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
Depositing User: | Restu Shaila Avenka |
Date Deposited: | 29 Aug 2022 06:46 |
Last Modified: | 29 Aug 2022 06:46 |
URI: | http://eprints.politeknikpu.ac.id/id/eprint/236 |