Cycle Time Loading Analysis Of Concrete Pile Product Analisa Waktu Pemuatan Produk Tiang Pancang di PT. Wijaya Karya Beton Boyolali (lokasi : TA2022TKJJ29-50)

Avenka, Restu and Rahayu, Nadila (2022) Cycle Time Loading Analysis Of Concrete Pile Product Analisa Waktu Pemuatan Produk Tiang Pancang di PT. Wijaya Karya Beton Boyolali (lokasi : TA2022TKJJ29-50). Diploma thesis, Politeknik Pekerjaan Umum.

[thumbnail of PERSETUJUAN PUBLIKASI] Text (PERSETUJUAN PUBLIKASI)
PERSETUJUAN - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (143kB)
[thumbnail of LEGALITAS] Text (LEGALITAS)
LEGALITAS - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (1MB)
[thumbnail of COVER] Text (COVER)
COVER - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (156kB)
[thumbnail of ABSTRAK] Text (ABSTRAK)
ABSTRAK - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (196kB)
[thumbnail of BAB I] Text (BAB I)
BAB I - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (856kB)
[thumbnail of BAB II] Text (BAB II)
BAB II - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of BAB III] Text (BAB III)
BAB III - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf
Restricted to Repository staff only

Download (687kB)
[thumbnail of BAB IV] Text (BAB IV)
BAB IV - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB V] Text (BAB V)
BAB V - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB VI] Text (BAB VI)
BAB VI - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (311kB)
[thumbnail of DAFTAR PUSTAKA] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf

Download (93kB)
[thumbnail of LAMPIRAN] Text (LAMPIRAN)
LAMPIRAN - RESTU - 192029 - NADILA - 192050 - TUGAS AKHIR - 2022.pdf
Restricted to Repository staff only

Download (4MB)

Abstract

Abstrak
The distribution process at PT Wijaya Karya Beton Boyolali which is carried out almost every day is directly proportional to the production process that is running every day. Distribution is done by transporting the product by each project in need. At one time, the distribution process can take a long time due to many factors. one of them is the finishing process which is often carried out when it will be distributed and the product stockyard area is not able to accommodate the number of products produced every day. PT Wijaya Karya Beton Boyolali also tries to send some of the products that have not been distributed by storing the products in additional storage areas. In order to shorten the distribution time, the researcher tries to analyze the problem at PT Wijaya Karya Beton Boyolali.

Item Type: Thesis (Diploma)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Masrianto, Masrianto
8887123419
UNSPECIFIED
UNSPECIFIED
Kesuma, Awan
3271050109870008
UNSPECIFIED
Subjects: L Education > L Education (General)
Divisions: Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3
Depositing User: Restu Shaila Avenka
Date Deposited: 12 Sep 2022 09:05
Last Modified: 12 Sep 2022 09:05
URI: http://eprints.politeknikpu.ac.id/id/eprint/207

Actions (login required)

View Item
View Item