FELICIA, AVISA (2026) PEMBANGUNAN JALAN TOL YOGYAKARTA-BAWEN SEKSI 2 (STA. 52+300 s.d STA. 67+500). Technical Report. Politeknik Pekerjaan Umum, Semarang. (Unpublished)
PERSETUJUAN-AVISA-222009-LAPORAN MAGANG-2026.pdf
Download (508kB)
COVER-AVISA-222009-LAPORAN MAGANG-2026.pdf
Download (97kB)
FULL REPORT-AVISA-222009-LAPORAN MAGANG-2026.pdf
Restricted to Repository staff only
Download (73MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email |
| Additional Information: | 2026 TKJJ 09 |
| Subjects: | L Education > L Education (General) T Technology > TE Highway engineering. Roads and pavements |
| Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
| Depositing User: | Avisa Felicia Putri |
| Date Deposited: | 24 Aug 2026 04:54 |
| Last Modified: | 24 Aug 2026 04:54 |
| URI: | https://eprints.politeknikpu.ac.id/id/eprint/1330 |
