Patimban Access Toll Road Construction Project Package 3 PT. Hutama Karya – PT. Jaya Konstruksi Manggala Pratama Joint Operation Kabupaten Subang, Provinsi Jawa Barat

Wijayanto, Antono and Vanessa, Elisabeth (2026) Patimban Access Toll Road Construction Project Package 3 PT. Hutama Karya – PT. Jaya Konstruksi Manggala Pratama Joint Operation Kabupaten Subang, Provinsi Jawa Barat. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)

[thumbnail of PERSETUJUANPUBLIKASI] Text (PERSETUJUANPUBLIKASI)
PERSETUJUAN PUBLIKASI-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf

Download (290kB)
[thumbnail of COVER] Text (COVER)
COVER-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf

Download (129kB)
[thumbnail of FULLREPORT] Text (FULLREPORT)
FULL REPORT-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf
Restricted to Repository staff only

Download (65MB) | Request a copy
Item Type: Monograph (Technical Report)
Contributors:
Contribution
Name
NIDN/NIDK
Email
UNSPECIFIED
Andani, Rikal
5206028401
UNSPECIFIED
UNSPECIFIED
Ikhwan, Fikri Auza'i
8748774675130262
UNSPECIFIED
Additional Information: 2026 TKJJ 12-17
Subjects: L Education > L Education (General)
T Technology > TE Highway engineering. Roads and pavements
Divisions: Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3
Depositing User: Antono Wijayanto
Date Deposited: 18 Aug 2026 12:27
Last Modified: 18 Aug 2026 12:27
URI: https://eprints.politeknikpu.ac.id/id/eprint/1072

Actions (login required)

View Item
View Item