Wijayanto, Antono and Vanessa, Elisabeth (2026) Patimban Access Toll Road Construction Project Package 3 PT. Hutama Karya – PT. Jaya Konstruksi Manggala Pratama Joint Operation Kabupaten Subang, Provinsi Jawa Barat. Technical Report. Politeknik Pekerjaan Umum. (Unpublished)
PERSETUJUAN PUBLIKASI-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf
Download (290kB)
COVER-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf
Download (129kB)
FULL REPORT-Antono Wijayanto-232112-Elisabeth Vanessa-232117.pdf
Restricted to Repository staff only
Download (65MB) | Request a copy
| Item Type: | Monograph (Technical Report) |
|---|---|
| Contributors: | Contribution Name NIDN/NIDK Email UNSPECIFIED Andani, Rikal 5206028401 UNSPECIFIED UNSPECIFIED Ikhwan, Fikri Auza'i 8748774675130262 UNSPECIFIED |
| Additional Information: | 2026 TKJJ 12-17 |
| Subjects: | L Education > L Education (General) T Technology > TE Highway engineering. Roads and pavements |
| Divisions: | Program Studi Teknologi Konstruksi Jalan Dan Jembatan > Teknologi Konstruksi Jalan Dan Jembatan D3 |
| Depositing User: | Antono Wijayanto |
| Date Deposited: | 18 Aug 2026 12:27 |
| Last Modified: | 18 Aug 2026 12:27 |
| URI: | https://eprints.politeknikpu.ac.id/id/eprint/1072 |
